01 · The estate and the decision
Choose a path after confirming the dependencies.
The fictional sponsor is considering a platform change while keeping document intake, task processing and ERP document access available. The sample assumes those connections exist. Their versions, configuration and operational readiness are deliberately unverified.
Capture → ContentDocuments enter the repository.
Content → WorkflowTasks use document references.
Workflow → ERPTransaction information crosses the interface.
ERP → ContentAuthorized users retrieve the linked document.
Assumed for this example. The arrows describe business dependencies, not a verified physical topology or a supported integration design. Identity, storage and recovery require their own checks.
Question to answer
Which change meets the business requirement without leaving an unowned document or workflow dependency?
Evidence boundary
A synthetic process sketch only. No system access, configuration inspection, user testing or recovery test has taken place.
02 · Findings and open questions
Make uncertainty actionable.
These are illustrative findings. Each connects a missing fact to a decision and names a proposed role to resolve it.
F1
Evidence needed
Release eligibility is unresolved
Example basis
The fictional inventory names the products but omits exact releases and patch levels.
Decision affected
A supported target and upgrade path cannot yet be selected.
Next evidence
Collect the release inventory, then check product certifications, interoperability and contractual support.
Proposed owner
Platform owner
F2
Assumed dependency
Document links need an acceptance contract
Example basis
The example assumes that a user opens a stored document from the ERP.
Decision affected
Changing storage or an interface requires proof that the link and the user’s access still work.
Next evidence
Document the identifier mapping and authorized-user behavior; agree positive and negative retrieval tests.
Proposed owner
Integration and business owners
F3
Not demonstrated
Recovery readiness is unknown
Example basis
No restore rehearsal is supplied in this fictional evidence set.
Decision affected
A production change window cannot be approved from backup availability alone.
Next evidence
Identify a consistent recovery point and demonstrate restoration in an isolated environment.
Proposed owner
Operations owner
03 · Decision and recommended sequence
Resolve the evidence gaps before selecting delivery.
Illustrative recommendation: proceed with scoped discovery.
This evidence set cannot justify selecting an upgrade, hosting move or workload replacement. Confirm the starting facts and acceptance requirements, then compare the applicable options. No implementation path or cost ranking is approved by this sample.
Retain and upgrade
Check the supported path, customization compatibility and available rehearsal window.
Change hosting
Check operational requirements and integration latency. Hosting alone does not change product support eligibility.
Replace a defined workload
Check retained records, access rules, active work and the responsibilities that remain with the existing estate.
01
Resolve the starting facts
Confirm releases, boundaries, ownership and the business requirement. Link each conclusion to the evidence reviewed.
Decision gate: The dependency map and inventory are agreed.
02
Compare applicable options
Assess retaining and upgrading, changing hosting, or replacing a defined workload against the confirmed constraints.
Decision gate: The sponsor understands the tradeoffs and remaining unknowns.
03
Rehearse the selected approach
Agree the implementation scope, acceptance tests and recovery conditions. Test the selected approach before committing to production.
Decision gate: Observed results support a separate go/no-go decision.
Review meeting agenda
Confirm the process boundary; challenge the assumptions; assign the open evidence requests; agree the next decision and the conditions needed to make it. Dates, effort and commercial terms belong in the actual agreed scope.